A TxDOT contractor has begun sealcoating several roads in Lamar and Red River Counties. The work is part of a district-wide project scheduled this summer at an estimated cost of more than $8.4 million. Some work times and locations may overlap, and traffic control measures may include some one-way operation during construction. Details on the work schedule are on our webpage.