TxDOT Paris District
For Feb. 3-9, 2019
Here’s a look at work planned in Franklin and Hopkins Counties during the week of Feb. 4, 2019. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay particular attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.
Hopkins, Franklin Counties
Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031
SH 37, Franklin County: From Mt Vernon to Winnsboro. Watch for lane closures and short traffic delays as crews perform surfacing operations; flaggers will direct traffic.
Delta, Lamar, Red River Counties
Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.
US 271 pavement repair, Lamar and Red River Counties: from Loop 286 in Paris southeastward to SH 37. Watch for temporary lane and/or shoulder closures as metal beam guard fence replacement continues.
FM 197, Lamar County: Watch for temporary lane closures as workers widen and reconstruct existing pavement.
US 271 safety upgrades, Red River County: from FM 410 to the Red River-Titus County line. Watch for temporary lane and shoulder closures as work continues.
SH 37 safety upgrades, Red River County: from the Texas-Oklahoma state line south to the Red River-Franklin County line. Watch for work zones as workers upgrade metal-beam guard fence, replace or extend new structures and install safety end treatments.
FM 2648 widening, Lamar County: Watch for temporary, one-lane daytime closures as workers widen and rehabilitate the roadway, and safety treats cross drainage structures.
SH 24 expansion, Delta County: from Cooper, Texas, southwestward towards Commerce. Watch for work zones and drive safely through construction areas while this roadway is being widened and improved. The inside southbound lane remains closed.
TxDOT Atlanta District
For Feb. 3-9, 2019
Bowie County
US 259 – At Red River north of De Kalb, constructing a new bridge.
Cass County
SH 11 – From Morris County Line to FM 130, upgrading guardrails.
Harrison County
Loop 281– at I-20 overpass, conducting preventative maintenance work on the bridge.
I-20 – at the Louisiana State Line, LaDOTD is conducting a bridge widening project just across the state line. Expect delays and watch for stopped traffic.
Morris County
US 259 – From I-30 to FM 557, upgrading guardrails, repairing pavement and resurfacing highway.
Panola County
SH 149 – At SH 315, constructing overpass and widening the highway.
US 59 – From Harrison County Line to FM 2792, upgrading guardrails, repairing pavement and resurfacing highway.
FM 699 – At FM 2517, reconstructing intersection.
Titus County
US 271 – From the end of freeway section of US 271 to 0.3 mile south of FM 3417, extending freeway lanes and constructing an overpass at FM 3417. New roadway planned to open on Friday, Feb. 1 was delayed until the following week.
US 271 – At Ripley Creek and Ripley Creek Relief, replacing bridges.
Upshur County
US 271– From SH 155 South to FM 726, upgrading guardrails, repairing pavement and resurfacing highway.