Paris — Here’s a look at work planned in Franklin and Hopkins Counties during the week of March 2, 2020. These schedules are subject to change due to weather conditions, equipment failure, or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades, and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

Hopkins, Franklin Counties

Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.

SH 11, Hopkins County: From SH 19 to White Oak Creek. Watch for lane closures and short traffic delays as crews replace an existing drainage structure; temporary traffic signals will direct traffic.

FM 1448, Franklin County: From Wood County Line to FM 115. Watch for lane closures and short traffic delays as crews install drainage structures.

IH 30, Hopkins & Franklin Counties: From Titus County Line to Hunt County Line. Watch for lane closures, and short traffic delays as crews upgrade Metal Beam Guard Fence.

FM 900, Hopkins County: IH 30 to Franklin County Line. Watch for lane closures and short traffic delays as crews install drainage structures.

 

TxDOT Atlanta District

For March 1-7, 2020

Bowie County

SH 8 – At Sulphur River, replacing bridges

US 59 – At Akin Creek, replacing guard rail

FM 559 – Between College Drive and Robison Road, installing sidewalks.

Cass County

SH 8 – At Sulphur River, replacing bridges

Harrison County

I-20 – At Potters Creek, conducting preventative maintenance work on bridges.

SH 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.

US 59 – From Marion County Line to Woodlawn Oaks Road, installing a median barrier.

Marion County

US 59 – From FM 2208 to Harrison County Line, installing a median barrier

Morris County

SH 49 – From Titus County Line to FM 144, repairing and resurfacing highway.

Panola County

SH 149 – At SH 315, constructing overpass and widening highway.

US 59 – At SH 149 interchange, concrete pavement replacement

Westside entrance and exit ramps closed. Detours in place.

US 79 – From FM 31 to Louisiana State Line, resurfacing highway.

Titus County

SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.

Upshur County

US 271—From Camp County Line to 0.5 miles north of FM 2088, resurfacing highway.

FM 1844—At 0.4 mile east of US 271, repairing culvert. Highway closed due to flood damage.