TxDOT Atlanta District
For July 5-11, 2020
Bowie County
SH 8 – At Sulphur River, replacing bridges.
SH 93– Between Meadow Lane and Kennedy Lane, installing sidewalks.
Cass County
SH 8 – At Sulphur River, replacing bridges.
Harrison County
US 59 – From FM 1997 to Marion County Line, repairing and resurfacing highway. Traffic restricted to one lane in each direction.
SH 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.
Loop 390 – From US 59 to SH 43 North, repairing and resurfacing highway. Road closed to through-traffic, a detour route is signed.
FM 1186 – From US 59 to Panola County Line, installing safety end treatments on culverts.
Marion County
US 59 – From 1.5 miles south of FM 2208 to Harrison County Line, repairing and resurfacing highway. Traffic restricted to one lane in each direction.
Morris County
SH 49 – From Titus County Line to FM 144, repairing and resurfacing highway.
Panola County
SH 149 – At SH 315, constructing overpass and widening highway.
US 79 – From SH 149 to Rusk County Line, repairing and resurfacing highway.
Titus County
SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.
Upshur County
US 271—From Camp County Line to 0.5 miles north of FM 2088, resurfacing highway.
TxDOT Paris District
For July 5-11, 2020
Delta, Lamar, Red River Counties
Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.
SH 19 at Loop 286 – Lamar County. Watch for temporary lane closures as crews install traffic signals.
BU 271D, Red River County: from US 271 to State Spur 38 (Bogata) watch for temporary lane closures while crews install new end treatments on drainage structures.
SH 37, Red River County: from US 271 (Bogata) to Franklin County Line. Watch for daytime lane closures as crews mill existing pavement and place new hot mix.
US 82, Red River County: from FM 1159 to Bowie County Line. Traffic is shifted to the south side of the existing roadway between FM 44 and FM 1699 while crews perform pavement widening work on the north side.
FM 195, Red River County: from FM 410 N to SH 37. Watch for temporary lane closures while crews upgrade metal beam guard fence and complete cross culvert extensions at 2 locations.
SH 37 safety upgrades, Red River County: from the Texas-Oklahoma state line south to the Red River-Franklin County line watch for temporary traffic signals at bridge locations while crews upgrade bridge rail from Clarksville to Bogata.
Hopkins, Franklin Counties
Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.
SH 11, Hopkins County: From SH 19 to White Oak Creek. Traffic will be shifted to the new roadway while crews repair the existing section. Watch for lane closures and short traffic delays.
SH 11, Hopkins County: From 1.5 miles east of FM 3134 to 0.82 miles east of FM 2653 watch for lane closures and short traffic delays as crews perform striping operations.
IH 30, Hopkins & Franklin Counties: From Titus County Line to Hunt County Line. Watch for lane closures, and short traffic delays as crews upgrade metal beam guard fence.