 Bowie County 

  • I-30 – From FM 989 to AR State Line, reconstructing and widening highway, daytime work in the median. Motorists should watch for trucks and equipment pulling onto the interstate.
  • SH 8 – At Sulphur River, replacing bridges
  • SH 98 – At Anderson Creek, bridge replacement and workers restrict traffic to one lane with signal lights controlling traffic through the work zone.

 Camp County 

  • SL 255 – From FM 1520 to US 271, constructing a highway with County Road 2120 detoured

Cass County 

  • SH 8 – At Sulphur River, replacing bridges
  • US 59 – Install safety barrier cable from 1.5 miles south of SH 155 to Marion County line. Daily lane closures
  • US 67 – Widening bridge at Jennings Slough. Signal lights controlling one-way traffic

Harrison County 

  • I-20 – At Lansing Switch Road, constructing a new bridge over the interstate. Lansing Switch Road is closed to traffic. Possible lane closures on I-20
  • SH 43 – At Kansas City Southern Railroad in Karnack, widening the bridge over the railroad. Northbound lanes closed with signal lights controlling one-way traffic.
  • I-20 – At US 59 overpass, replacing the bridge. Possible lane closures on US 59 and I-20

Marion County 

  • US 59 – From SH 49 to two miles north of SH 49, repairing and resurfacing highway. Traffic pushed to outside lanes in both directions.
  • US 59 – From Cass County line to 2 miles north of SH 49, installing safety barrier cable. Daily lane closures

Morris County 

  • SH 49 – From Titus County line to FM 144, repairing and resurfacing highway. One-lane, two-way traffic

Panola County 

  • US 59 (Loop) – From Business 59 North of Carthage to US 79 East, rehabilitating highway. Traffic shifted to outside lanes on US 59 & BU 59. Loop EB exit ramp closed, WB entrance ramp open.
  • US 79 – From SH 149 to Rusk County line, rehabilitating highway. Daily lane closures, expect delays.
  • SH 149 – From US 79 to .8 miles south of SH 315. Some lane closures during the final phase

Titus County 

  • SH 49 – From FM 1735 to Morris County line, repairing and resurfacing highway. One-lane, two-way traffic
  • SH 49 – From Business 271 to Mount Pleasant city limits, repairing and resurfacing the road. One-lane, two-way traffic
  • CR 4550 – At Hart’s Creek, replacing the bridge with CR 4550 closed to through traffic.

TxDOT Paris District

Nov. 21 – Nov. 27, 2021

Delta, Lamar, Red River Counties

Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.

SH 37, Red River County: drivers should watch for temporary lane closures from US 82 to the Texas-Oklahoma state line while crews resurface the roadway.

US 271, Red River County: from SH 37 to Titus County Line. Watch for temporary lane closures while crews resurface the roadway.

FM 906, Lamar County: from FM 2648 to CR 47400. Watch for work zones as crews perform tree trimming and removal work and drainage structure improvements.

FM 38, Lamar County: from US 82 to US 82. Watch for temporary lane and shoulder closures while crews improve drainage structures and upgrade bridge rail and metal-beam guard fence.

FM 195, Red River County: from the Lamar County line to SH 37, drivers should watch for temporary lane and shoulder closures while crews improve drainage structures and replace bridge rail.

FM 1487, Red River County: from FM 909 to FM 910. Watch for temporary lane closures while crews widen and rehabilitate the existing pavement and improve drainage structures.

US 82, Red River County: drivers should watch for work zones from FM 1159 to the Bowie County line and drive safely through construction areas as crews perform final work.

Loop 286, Lamar County: from FM 1497 around the North Loop to FM 1507. Watch for temporary lane and shoulder closures while crews improve guardrail and drainage structures

FM 79, Lamar County: from 0.6 miles Northeast of State Loop 286 to 0.8 miles Northeast of State Loop 286, the roadway is closed to replace a cross-drainage structure. Weather and other conditions permitting, FM 79 should reopen through traffic on Tuesday, Nov. 23.

Hopkins, Franklin Counties

Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.

SH 37, Franklin County: from the elementary school to US 67, drivers should watch for lane closures and short traffic delays as crews install the sidewalk.